Cloudray Leadshine DM542 2 Phase Stepper Driver
Cloudray Leadshine DM542 2 Phase Stepper Driver
- Cloudray Official Quality Inspection(100% brand new original authentic)
- More Details of Configurations in Description (Click to Expand)
- Secure payments; Lifetime Tech Support (Specialists)
- Support Shipping Worldwide

Parameters |
DM542 |
|||
Min |
Typical |
Max |
Unit |
|
Output Current |
1.0 |
- |
4.2 (3.0 RMS) |
A |
Supply Voltage |
20VAC |
24-48VAC |
50VAC |
V |
Logic Signal Current |
7 |
10 |
16 |
mA |
Pulse Input Frequency |
0 |
- |
200 |
kHz |
Step Revolution |
400 |
|
25600 |
Pulse/Rev |
Isolation Resistance |
500 |
MΩ |
||
Suitable Stepper Motors |
NEMA 16,17,23 |

P1 Function |
DM542 Details |
PUL |
Pulse signal: Pulse active at rising edge; 4-5V when PUL-HIGH, 0-0.5V when PUL-LOW. Minimal pulse width of 2.5μs. Add a resistor for current-limiting at +12V or +24V input logic voltage (1K for +12V, 2k for +24V). The same as DIR and ENA signals. |
DIR |
DIR signal:This signal has low/high voltage levels to represent two directions of motor rotation.. Minimal direction setup time of 5μs. Also swapping the connection of two wires of a coil (e.g. A+ and A-) to the drive will reverse motor direction. |
ENA |
Enable signal: This signal is used for enabling/disabling the drive. High level +5V (NPN control signal) for enabling the drive and low level for disabling the drive. PNP and Differential control signals are on the contrary, namely Low level for enabling. By default it is left UNCONNECTED (ENABLED). |
P2 Function |
DM542 Details |
+Vdc |
Power supply positive connection. Suggest 24-48VDC power supply voltage |
GND |
Power Ground. |
A+, A- |
Motor Phase A |
B+, B- |
Motor Phase B |
Notification: Customs clearance inspections (CN Warehouse) will cause delays 2-3 days in logistics.
1. Accessories sitewide: 3-7 Business Days
2. Machine with the default configuration: CN Warehouse: 5-7 Business Days
USA/EU Warehouse: 3-7 Business Days
3. Customized Machine (Only Support Shippment From China Warehouse)
The average period of production: 7-10 Business Days
Shipping: 7-10 Business Days